So.. made a start on fabricating my box for the compressors, driers and air tank
Revision #3
WiP, folded, clamped and welding under way… it’s been a while since I’ve held a welding torch in my hand
After 2 failed attempts… the final version c/w tank and air vents. Mrs C added the bow as she couldn’t believe this took 3 days!
Installation in a couple of weeks under the van, through the load area.
Bracket for the Grinds controller, alarm, BT module and power connection test fitted. Started pulling in the power wires along with the front airlines. Excuse the mess, all hoovered prior to refitting covers/carpets
New power wire pulled in by removing the soon to be redundant PTC heater power wire making it a breeze!
Test fit of the control panel
Flexible conduit used to give mechanical protection to the power wires as well as the air lines. Airlines to the front are of equal length to reduce the risk of uneven transitioning of the bags.
Nice little transition through the scuttle after a slight mod to the existing wire seal. Might change this as it looks a little out of place.
Sent from my iPad using Tapatalk